Projects

Projects

Berminghammer EML45 – Gorge Creek – Wilco

In 2019 Wilco’s (Thunder Bay, Ontario) David Cramer contacted Berminghammer about their new line of Excavator Mounted Leads (EML) for pile driving. Having heard about Berminghammer through the Ontario Road Builder’s Association, Cramer was interested in the use of an EML for doing structural work in a market that prohibited the use of […]

Projects

Bear Canyon Soldier Pile Wall

Onalaska, Washington History Washington State Department of Transportation (WSDOT) is responsible for maintaining state highway Route 508 that runs between the small towns of Morton and Onalaska in Washington. The road winds through an area known as Bear Canyon and provides critical access for local residents and businesses. When a […]

Projects

Details and Benefits of a Design-Phase Pile Test Program

by Ben White, P.E. An intensive design-phase pile test program saved significant time and money on the I-480 Valley View Bridge project near Cleveland, Ohio. The design-build team of Walsh Construction and CH2M (now Jacobs) developed the pile load test program and contracted GRL to perform the testing and analysis. […]