pilebuck.com
Blue Lake Hydroelectric Dam - Pile Buck Magazine
An increase in demand for renewable electric energy in Sitka, Alaska led the City and Borough of Sitka to investigate the potential expansion of the Blue Lake Project. Current resources were being exhausted and hydroelectric generation was operating at 96 percent capacity. The existing Blue Lake Project, located approximately five miles east of Sitka, consists of a dam, a submerged intake structure, a power conduit,